Major Oil & Gas Operator

North Sea Platform Power Overhaul

Complete replacement of 11kV Main Switchboard (MSB) and distribution systems on an active drilling platform. Integration with existing PMS.

Key Metrics
Zero downtime during transition.
30% increase in power efficiency.
Full DNV Classification Approval.
Before
Before
After
After
Global Logistics Fleet

LNG Tanker Automation Upgrade

Retrofitting of Integrated Automation Systems (IAS) for cargo pumps and bridge navigation consoles for a fleet of 5 LNG carriers.

Key Metrics
Enhanced safety compliance (SOLAS).
Real-time satellite data integration.
Completed during dry-dock window (14 days).